7 Transporting the Sunny Central SMA Solar Technology AG
28 SCCPXT-IA-D7-en-42 Installation Manual
7.4 Transporting the Sunny Central Using a Crane Fork
Requirements:
The crane and crane fork must be designed to take the weight of the Sunny Central.
The crane fork must be properly coupled to the crane.
All kick plates must be removed.
Procedure:
1. Move the crane forwards until the crane fork is positioned
underneath the Sunny Central from the front or the rear. Take the
center of gravity of the Sunny Central into account and move the
crane fork right under the Sunny Central.
2. Slowly raise the crane fork with the Sunny Central.
3. Transport the Sunny Central to the mounting location and set down on a suitable surface.
:$51,1*
Danger of crushing if the Sunny Central tips over
With the kick plates mounted at the rear of the Sunny Central, the supporting surface of the Sunny Central on the tines
of the crane fork is inadequate. Vibrations during transport may cause the Sunny Central to slip off the crane fork and
tip over. This can result in death or serious injury.
Disassemble all kick plates before transporting the inverter using a crane fork.
When the kick plates are mounted, always stabilize the Sunny Central with crane slings or steel chains during
transport.