EasyManua.ls Logo

SMA SUNNY CENTRAL 900CP XT - Page 22

SMA SUNNY CENTRAL 900CP XT
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Preparation for Installation SMA Solar Technology AG
22 SCCPXT-IA-D7-en-42 Installation Manual
Minimum Clearances for One Sunny Central
Figure7: Minimum clearances for the Sunny Central
Minimum Clearances for Two Sunny Central Inverters with MV Transformer to be Installed
Outdoors
Option 1
Figure8: Option 1: Minimum clearances for two Sunny Central inverters with MV transformer
Minimum clearance between two inverters
The minimum clearance between two inverters is 500 mm.
SMA Solar Technology AG recommends a clearance of 800 mm between the inverters to facilitate maintenance
and cleaning work.
Position Designation
A Sunny Central 1
B Sunny Central 2
C MV transformer and medium-voltage switchgear

Table of Contents

Other manuals for SMA SUNNY CENTRAL 900CP XT

Related product manuals