SMA Solar Technology AG 7 Transporting the Sunny Central
Installation Manual SCCPXT-IA-D7-en-42 31
Procedure:
1. Release the screws of the right-hand ventilation grid.
2. Pull the lower side of the right-hand ventilation grid forwards to
remove it.
3. Release the screws of the left-hand ventilation grid.
4. Pull the lower side of the left-hand ventilation grid forwards to
remove it.
5. Pull the front edge of the roof forward and push upward.
6. Gently push the roof to the rear to slide it out of the guide rails.