EasyManua.ls Logo

SMA Sunny Island 2012 - Standard View 2

SMA Sunny Island 2012
212 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA Solar Technology AG Operating the Sunny Island
Technical Description SI2012_2224-TEN082311 93
10.2.2 Standard View 2
The standard view 2 shows the operating states of the Sunny Island:
Battery charge power
•Output power
Power from the grid/generator
as well as various information items on the status line.
A Battery charge level in [%]
B Output power of consumers in [kW]
C Power drawn from the grid/generator (AC2) in [kW]
D Device hierarchy (master, slave 1, slave 2)
E grid/generator limits
F MMC/SD card in use
G Direction of energy flow and system status
H Status of grid/generator (alternates with GenReq)
IRelay 1 Status
JRelay 2 Status
K Warning message
B
A
G
D
K
E
C
F
H
I
J

Table of Contents

Related product manuals