Copyright 12/14 44 S/N XXXX WO#XXXXXX
Smoracy, LLC
MODEL 3680 CONTROLS/START-UP PROCEDURES
BEFORE STARTING ENGINE
1) Wear all applicable personal protective
equipment; hard hat, gloves, eye protection,
ear protection, etc.
2) Observe all safety procedures on decals, in video
tape and from manual.
3) Check inserts and Cutterbody bolts. Change
if necessary.
4) Inspect/replace axle dust caps, or grease
axles per axle MFG. manual. Inspect and
adjust brakes as needed per axle MFG.
manual.
5) Check the entire machine for any loose parts
or components. Check for loose nuts or bolts,
torque, tighten or replace.
6) Check hydraulic pump and motor shaft for fit
and tightness.
7) Check the Infeed Conveyor for any foreign
objects.
8) Daily grease all related bearings and oil all
roller chains.
9) Check radiator, debris screen. Clean as
necessary.
10) Check the fuel level, check the fuel lines, fuel
tank, and fittings for fuel leaks.
11) Check and/or adjust belt tension on recycler
belt drives.
12) Check engine oil and coolant levels, make
sure they are at the proper level for operation.
13) Check hydraulic oil level, this should always
be 7/8 full. Remember to check DAILY to
avoid excessive heat build up.
14) Check the air cleaner and pre-cleaner. Clean as
necessary.
15) Check all engine air intake and exhaust compo
nents: Including pre-cleaner, air cleaner, turbo
clamps, muffler clamps etc. for missing or loose
nuts and bolts. Tighten or replace as necessary.
16) Make sure all guards and shields are tight and
securely in place.
17) Check around the machine for tools, cans,
saws, etc.
18) Make sure Discharge Belt Conveyor is located
in a safe direction.
19) Check clutch for proper engagement tension
and lubrication, frequently adjust and grease,
per PTO manufacturers manual recommendations.
20) Block tires and tongue for stability before
operation.
21) Check Infeed Conveyor chain tension, keep
chain tight and lubricated.
22) Fasten debris screen in front of radiator.
23) Confirm that all manual hydraulic control
valves are in the off position.
24) Fold clutch handle out from its transport
position and pin into place.
25) Make sure clutch is disengaged.
26) Check to ensure Hydraulic Shut Off Valve is
open.
27) Check to ensure cutting teeth and cutter bodies are
in good running condition.
28) Check tooth clearance between chain (min 3/4” or
19.1mm), anvil (min 1/4” or 6.4mm), concave gate
(min 1/4” or 6.4mm), and screen (min 1/4” or 6.4mm)
START-UP PROCEDURES
29) Turn the Battery Disconnect Switch on.
30) Check to ensure remote control switch on
engine gauge panel is on manual.
31) Make sure throttle switch is in the idle
position.
32) Remove all potential fire hazards.
33) Remember to check EVERYTHING on the
checklist.