Pre-Installation Planning
7
Pre-Installation Planning
Pre-installation involves the following:
1. Checking equipment (hardware, software, power supply, and wiring).
2. Checking power, wiring, equipment clearances, and code compliance at the site.
3. Ensuring the proper tools are available.
Equipment Check
Verify that the contents of the shipped boxes match the packing lists. Contact Software House
if any items are missing or damaged.
The iSTAR Edge hardware does not include mounting hardware for an installation. Mounting
hardware depends upon the site and must be approved by a structural engineer or other
certified professional.
Software House recommends anchoring systems capable of sustaining a 20 lb. load.
Site Check
Ensure that the mounting site is ready:
Mounting dimensions
• The can is 12” by 12” (30.48 x 30.48 cm)
• Upper mounting holes are 9" (22.86 cm) center to center.
• Bottom mounting holes are 10.5" (26.67 cm) below the upper mount holes.
The site has been approved and all wiring complies with UL requirements and other
codes, as appropriate.
All preliminary site work is complete.
An appropriate power supply is accessible.
The site is clean and free of dust or other contaminants.