Site Status
The Site status screen shows the accumulated status of all inverters connected to a
master inverter in a chain (bus) and the master inverter status.
Status
Site
Production
90 kW
Limit
1.00 MW
Inverters
10/10
Inverter
SN 07318000C
Power
100 kW
Voltage
277 Vac
Frequency
60.9 Hz
P_OK: 31 0f 31
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
OFF
CosPhi
1.00
Limit
Export
Country
USA2
Switch Off. Production disabled
Commissioning
Site status:
Production: The AC output power
Limit: Limitation setting (Export or Production)
Inverters: Number of connected inverters in the cluster, including the master
Chapter 4: Activating, Commissioning and Configuring the System 51
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge EV Series and is the answer not in the manual?

SolarEdge EV Series Specifications

General IconGeneral
AC Frequency60 Hz
Protection RatingIP65
AC Voltage208/240 V
EV Charger Output Voltage208/240 V
EV Charger Max. Output Current32 A
CommunicationEthernet, Wi-Fi
SafetyUL1741
Operating Temperature Range-25°C to 60°C