11. Insert the wires from the inverter into the openings in the Connection Unit with
Safety Switch and the ferrite bead.
12. Reconnect the cables: Follow the instructions of
Installing the Inverter
on page 30.
13. Close the inverter cover.
14. Fasten the Connection Unit with Safety Switch bracket using a standard bolt.
15. Perform the commissioning steps as described in
Activating, Commissioning and
Configuring the System
on page 42.
EV Charging Single Phase Inverter Guide MAN-01-00588-1.1
82 Replacing the Connection Unit with Safety Switch