Programming
Instruction Manual
31
If no tool is attached or if at least one Job exists, the Job tab appears allowing for expert user programming.
3.1.1.1 Wizard Screens
The Wizard presents programming parameters and gives a list of strategy controls (Smart Steps). The first 2
Wizard screens define the Audit step of the Task. The Smart Steps are helper steps inserted either before or after
the Audit step. Smart Steps cannot be audit steps. Only STRATEGY steps can be audit steps. A Task must have
at least one STRATEGY (non-Smart step) step. When complete the Wizard will have created the Job, Task and
appropriate steps based on programming input.
Strategy
Identifies the values used for controlling the tool during the a step. Choose the strategy
required for the Audit step of the Job and Task being programmed. See section “3.1.2.4
Step Button” on page 43 for an explanation of the strategies.
• TORQUE - Torque Control/ Angle Monitor (TC/AM)
• ANGLE - Angle Control/ Torque Monitor (AC/TM)
• TORQUE & ANGLE - Torque Control/ Angle Control (TC/AC)
Batch Count
The number of fasteners required to be secured in a Task. Typically used with an error
proofing scheme and remote input and output device. Acceptable values are between 1
and 99. The default value is 1.