– Stop the engine and, if needed, the heater
and combustionchamber.
– Put on protective gloves.
– Close the shutoff valve (1).
– Remove the cap from the filler valve (4).
– Open the shutoff valve (3)
– Check the filling pistol thread for cleanli-
ness.
– Connect the filling pistol to the filler valve
(4).
– Open the main shutoff valve of the LPG sta-
tion and operate the pump motor or filling
pistol until the valve installed in the tank
stops the filling.
Capacity : approx. 35,0 litres
– Release the filling pistol control immediately
and terminate the filling procedure.
– Turn off the pump motor and the main shut-
off valve at the LPG station.
CAUTION
The LP-gas tank may only be filled until the metering
valve shuts off and not according to the reading on
the fuel level gauge (2).
– Carefully remove the pistol from the filler
valve (4).
– Screw the cap on the filler valve.
CAUTION
If problems or special incidents occur during the fill-
ing procedure, notify the responsible persons and
have the faults corrected.
– Perform a leak test with leakage spray ac-
cording to the inspection and maintenance
instructions.
* Option
Use and Operation
4
Fill the LPG tank*
6360118011601 EN - 09/2020