Maintenance Manual
20
FOOT RAIL REPLACEMENT
Required Tools:
Small Slotted Head Screwdriver No. 2 Phillips Screwdriver 5/32" Allen Key
Bungee Cord
Procedure:
N
N
O
O
T
T
E
E
Unless otherwise indicated, refer to figure 4.1B on page 19 for the illustration of this procedure
reference points.
1. Run the bed fully up and apply the brakes. Raise the siderail needing repair.
2.
Unplug the bed power cord from the wall outlet.
3.
Using a small slotted head screwdriver, lift and remove the following self-sticking parts: the
three screw-covers (B) and the "Lift to release siderail" label (C) to expose the screws
holding the siderail cover. Proceed gently when inserting the screwdriver under the labels to
avoid scratching the molded rail.
N
N
O
O
T
T
E
E
Do not reuse the self-sticking parts removed since their self-adhesive coating considerably
looses its efficiency once they are removed. Replace them with new parts.
4. Using a no. 2 Phillips screwdriver, remove the eight screws (D) holding the cover to the
siderail and remove the cover.
The eight screws (D) must be replaced with new identical screws because their Scotch-Grip
coating is less efficient once they have been tightened and removed thereafter.
5. Remove the yellow locking lever (E).
6.
Using a no. 2 Phillips screwdriver, remove the screw (F) holding each siderail arm plastic
cover and lift up the covers to remove them.
7.
Using a 5/32" Allen key, remove the two Allen screws (G) holding each pommel to the
siderail arms. Leave one loosened screw on each pommel until ready to remove both
pommels.
8.
While supporting the rail, remove the two last screws, the pommels, the bungee cord and
finally the rail.
N
N
O
O
T
T
E
E
Note the position of the pommel with the lock (left pommel when facing the rail) when the
siderail is fully raised. The rail will not lock in high position if this pommel is positioned
differently.
9.
Reverse the above steps to install the new rail.
10.
Test the siderail for proper operation before returning the bed to service.
FOOT SIDERAIL MECHANISM REPLACEMENT
Required Tools:
Small Slotted Head Screwdriver No. 2 Phillips Screwdriver 5/32" Allen Key
Bungee Cord 1/2" Socket Wrench 1/2" Wrench
Procedure:
1. Follow steps 1 to 8 of the foot end rail replacement procedure above.
2. Using a 1/2" socket wrench and a 1/2" wrench, remove the four locknuts/bolts (K, fig. 4.1B,
page 19) holding the mechanism assembly to the support and remove the assembly.
3. Reverse the above steps to install the new mechanism assembly.
4. Test the siderail for proper operation before returning the bed to service.
W
W
A
R
R
N
N
I
I
N
N
G
G