EasyManua.ls Logo

Sulzer XFP 100E-VX - User Manual

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
www.sulzer.com
Installation, Operating and Maintenance Instructions
Submersible Sewage Pump Type ABS XFP PE1-PE3
en
6005675 (11.08.2021)
EN 5675-L

Table of Contents

Questions and Answers

Summary

Performance range

Safety

Personal protective equipment

Mandatory protective gear for installation, operation, and service.

Use of motors in Ex zones

Explosion-proof approvals

Details on Ex certifications, standards, and protection methods.

Lifting, transport and storage

Lifting

Safe methods and equipment for lifting the pump unit.

Vertical lifting

Procedure for lifting the pump vertically using the designated lifting points.

Horizontal lifting

Procedure for lifting the pump horizontally using eyebolts.

Mounting and installation

Equipotential bonding

Requirements for equipotential bonding in pump installations.

Installation types

Overview of different installation methods for XFP pumps.

Submerged in concrete sump

Detailed steps for installing the pump in a submerged concrete sump.

Dry-installed

Instructions for installing the pump in a dry, non-submerged configuration.

Electrical connection

Seal monitoring

Explanation of the leakage sensor (DI) and its integration.

Operation with frequency inverters

Conditions and guidelines for operating pumps with frequency inverters.

Commissioning

Checking direction of rotation

Procedure for verifying correct motor rotation direction before operation.

Maintenance and service

Clearing pump blockage

Steps to take to clear a blocked pump impeller.

Instructions for service personnel

Detailed procedure for service personnel to clear pump blockages.

Troubleshooting Guide

Summary

Performance range

Safety

Personal protective equipment

Mandatory protective gear for installation, operation, and service.

Use of motors in Ex zones

Explosion-proof approvals

Details on Ex certifications, standards, and protection methods.

Lifting, transport and storage

Lifting

Safe methods and equipment for lifting the pump unit.

Vertical lifting

Procedure for lifting the pump vertically using the designated lifting points.

Horizontal lifting

Procedure for lifting the pump horizontally using eyebolts.

Mounting and installation

Equipotential bonding

Requirements for equipotential bonding in pump installations.

Installation types

Overview of different installation methods for XFP pumps.

Submerged in concrete sump

Detailed steps for installing the pump in a submerged concrete sump.

Dry-installed

Instructions for installing the pump in a dry, non-submerged configuration.

Electrical connection

Seal monitoring

Explanation of the leakage sensor (DI) and its integration.

Operation with frequency inverters

Conditions and guidelines for operating pumps with frequency inverters.

Commissioning

Checking direction of rotation

Procedure for verifying correct motor rotation direction before operation.

Maintenance and service

Clearing pump blockage

Steps to take to clear a blocked pump impeller.

Instructions for service personnel

Detailed procedure for service personnel to clear pump blockages.

Troubleshooting Guide

Sulzer XFP 100E-VX Specifications

General IconGeneral
BrandSulzer
ModelXFP 100E-VX
CategoryWater Pump
LanguageEnglish

Related product manuals