EasyManua.ls Logo

SunStar SPS/E-1306 Series

SunStar SPS/E-1306 Series
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
5.3) Thread
5.3.1) Upper thread placement
Hook the upper thread as shown in the following picture after setting the thread take-up lever at the highest
position. As with the needle bar thread guide, hook the thread as shown in picture for heavy materials.(SPS/E-
1306(1507)-HS)
5.3.2) Lower Thread Placement
1) Insert bobbin into bobbin case as shown in the
picture.
2) After setting the lower thread through the crack
of the bobbin case, insert the thread through
thread hole.
3) Adjust the lower thread to hang 25mm out of
thread hole.
Picture
Thread Hole
Bobbin Case
Bobbin
25mm
Insert the bobbin to turn clockwise when seen from behind the bobbin case
Caution

Table of Contents

Related product manuals