EasyManua.ls Logo

SunStar SPS/E-1306 Series

SunStar SPS/E-1306 Series
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15
Hinge Rubber
4.4) Machine Installation
1) Install the waste oil can support, the oil dish, the
control box, and the power switch on the table.
2) Install the bed cushion rubber and the support
rubber for safety switch to prevent the machine
vibration and noises from occurring.
3) To fix the machine, attach the hinge and the hinge
rubber to the bed, and install them on the table by
using fixing bolts.
Fixing Bolt
To prevent safety accidents, at least two persons shall be assigned to machine installation or machine
delivery.
Caution
Cushion
Rubber
Safety Switch Rubber
Oil Dish
Waste Oil Can
Support
Control Box
Power Switch
Hinge

Table of Contents

Related product manuals