What this page displays:
A setting to prevent the inverter exporting power to the grid - ‘Zero Export’.
The ability to limit power supply to only the household loads - ‘Solar Export’.
Set the power limits to supply only the loads connected to the LOAD port - ‘Priority to
Load Only’.
What you can do from this page:
Set a real time to charge or discharge the battery.
Choose to charge the battery from the grid or generator.
Limit export power to the grid.
Set the unit to charge the battery from the grid or generator ticking ‘Grid’ or ‘Gen’ and
set what times this needs to occur.
Set the time to discharge the unit to the load or export to the grid by unticking ‘Grid’ and
‘Gen’.
Concerning the detailed figure above:
1. Tick this box to do not export power back to the grid (the CT coil will detect power
flowing back to the grid and will reduce the power of the inverter only to supply the local
load).
2. Tick this box if you wish to export your solar power back to the grid.
3. Tick this box if you only want to supply power to the load side of the inverter.
4. ‘Zero Export Power’ is the amount of power flowing from the Grid to the Inverter. Set
this value to ’20 - 100W’ to instruct the inverter to always take the prescribed amount of