Chapter 5 Start up
www.supmea.com
-31-
Chapter 5 Start up
5.1. Power on
Please check whether the installation is correct before power on, including:
1
The meter must be installed following safety compliance.
2
Power supply connection must be performed in accordance with the
regulations.
3
Please check the electrical connection in the power supply is correct.
4
Tighten the converter shell back cover.
5
Tighten the back cover of the converter housing
5.2. Converter start up
The measuring instrument is consisted of measuring sensor and signal converter;
the delivery can be put into service. All parameters and hardware are configured
according to your order.
After energization, the instrument will perform self-check for one time.
Then it will immediately begin to measure and display the current values.
Figure 25 Startup interface