EasyManua.ls Logo

Suzuki DF 2.5 - Page 72

Suzuki DF 2.5
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-6 POWER UNIT
FINAL ASSEMBLY CHECK
Perform the following checks in order to ensure proper and safe
operation of the repaired unit.
All parts removed have been returned to the original posi-
tions.
Lower unit gear engagement is properly adjusted.
(See page 8-19.)
Fuel hose routing matchs service manual illustration.
(See page 9-2.)
Wire routing matchs service manual illustration.
(See page 9-3.)
No fuel leakage is evident.
No water leakage is evident during final test running.

Table of Contents

Related product manuals