3-10 ENGINE
•
Tighlen the exhausl pipe nul
CD,
exhausl pipe boll
0,
muffler
conneclion bolt @, mu
ff
ler mounling boll
@,
and muffler mounl-
in
g nul @ 10 the speci
fi
ed torqu
e.
Be sure to tighten the nuts and bolts
in
the following order.
• Exhaust pipe nut and exhaust pipe bolt
(CD,
0 )
• Muffler mounting nut @
• Muffler mounting bolt @
• Muffler connection bolt @
(!)
Exhaust
pipe
nut
and
bolt
: 23
N·m
(2.3
kgf-m
, 16.5 Ib-ft)
Muffler
connect
i
on
bolt
: 20 N·m (2.0
kgf-m
,
14.5
Ib-ft)
Muffler
mounting
nut
and
bolt
:
23 N·m (2.3
kgf-m
,
16.5
Ib-ft)
• Pour 1.9 L (2.0 US qt. 1.7 Imp qt) of an A
PI
service classified
SF or
SG
engine oil that has a viscosity rating of SAE 10W-40,
i"
lu
II
It
, uil lill
'"
I,
ule, located
In
th
e frame, a
lt
er overhauling it.
• Start the engine and allow it to
ru
n for about three minutes at
idle speed.
• Turn off the engine and wait about three minutes, and then
check the
oil level
on
the dips
ti
ck.
~
Engine
oil
capacity
Oil
change:
Oil
and
filter
change:
Engme
overhaul:
1.7 L (1.8 US
qt
,
1.5
Imp
qt)
1.8 L (1.9 US
qt
, 1.6
Imp
qt)
1.9 L (2.0 US
qt
, 1.7
Imp
qt)
• Adjust the following items to specification.
+
Throttle
c ..
ble
pl
..
y ................................................
CT
2-13
*
Engine
idle
speed
.................................................
c:::::r
2-14
*
Brake
pedal
......
..
........................................
..
..
..
.....
c:::::r
2-18
http://www.motorcycle.in.th