Installing the TGA 2050
2–24 TA I
NSTRUMENTS
TGA 2050
Figure 2.14
Installing the Sample
Hang-Down Wire
6. Thread the hang-down wire up through the
hang-down tube into the balance chamber,
and hook the top of the wire over the top of
the tube (see Figure 2.15 on the next page).
To make the hang-down loops easier to see, we
suggest sliding a piece of white paper into the
balance chamber behind each loop before you hook
the hang-down wire into it. (Do not forget to
remove the paper when finished.)
7. Grasp the top hook of the hang-down wire
with brass tweezers. Being careful to keep
the top hook pointing to the left, pass the
double bend through the hang-down loop so
the wire is hanging from the loop.
8. Unscrew and remove the tare tube.
Hang-Down
Tube
NOTE: