3-6
OPERATION
OPERATING THE MACHINE
LEVER PATTERN (ISO PATTERN)
WARNING
• Before starting operation, carefully check which lever pattern you are going to use.
• It is described using the ISO pattern in this manual.
Left crawler forward Right crawler forward
Left crawler reverse Right crawler reverse
Arm out Boom lower
Arm in Boom raise
Upperstructure slew left
Bucket load
Upperstructure slew right
Bucket dump
Boom offset left
Dozer blade lower
Boom offset right
Dozer blade raise
OPERATING THE MACHINE