EasyManua.ls Logo

Takeuchi TL230 - Page 109

Takeuchi TL230
208 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-21
OPERATION
Raise the lift arms and tilt the bucket forward, then release it as the machine is driven forward.
Next tilt the bucket forward and lower the front edge until it is slightly above the ground
surface, then back the machine over the load that was just released.
Backfilling
With the bucket lowered, drive near the hole and tilt the front edge of the bucket downward as
soon as it passes over the near side of the hole. Raise the bucket and empty the load only
when necessary.
Leveling
OPERATING PROCEDURES

Table of Contents

Related product manuals