6 - Preventive Maintenance and Repair
Maintenance Schedule
Tecan Vacuum Separator (Te-VacS™) Operating Manual, 391236, en, V4.0 39 / 54
6.3 Maintenance Schedule
To ensure optimum performance and reliability, perform the maintenance and
cleaning tasks as recommended.
6.3.1 End of Day Maintenance Table
The following maintenance tasks must be performed after 8 hours of operation or
after each run.
The following table lists the maintenance tasks at the end of the day in
chronological order:
Component Maintenance
Task
Cleaning Agent Reference
Base plate vac-
uum block
Spacer
Vacuum block
Clean and decon-
taminate
Use isopropyl al-
cohol, a commer-
cially available
mild detergent or a
decontamination
solution as clean-
ing agents.
Refer to section “Clean-
ing the Te-
VacS” [}41].
Waste bottle Empty and flush Use isopropyl al-
cohol, a commer-
cially available
mild detergent or a
decontamination
solution as clean-
ing agents.
Refer to section “Clean-
ing the Te-
VacS” [}41].
Vacuum path Clean and flush Use isopropyl al-
cohol, a commer-
cially available
mild detergent or a
decontamination
solution as clean-
ing agents.
Refer to section “Clean-
ing the Te-
VacS” [}41].
Tubing connec-
tions
Check – –
Table5: End of day maintenance