Chapter 10 Test Run 125
Chapter 10 Test Run
10-1 Confirmation before Test Run
Confirmation *The control panel is vertically
before installation installed properly.
*Each module is fasten in fixed place.
*Properly wiring
*Terminal Block is well locked by screw.
Confirmation on power *Cable complies with specified requirement.
cable, I/O cable and *Power cable is wrapped?
Signal cable *Check if the I/O cable is routed parallel
or close to high voltage and current cable.
*Check the output cable is protected by fuse.
*Signal cable is shielded twisted wires?
Power Supply Confirmation *The voltage of power supply is as specified.
End of Test Run