EasyManuals Logo

Textron Bell 212 User Manual

Textron Bell 212
269 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #114 background imageLoading...
Page #114 background image
BHT-212-MM-1
5-00-00
26 JUN 2013 Rev. 14 Page 91
Export Classification C, ECCN EAR99
SCHEDULED INSPECTIONS
5-14. 600 HOURS/12 MONTHS — PART B
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. ______________________
FACILITY: ___________________________________________
HELICOPTER S/N: ____________________________________
REGISTRY NO.: ______________________________________
TOTAL TIME:________________________________________
SIGNATURE:_________________________________________
NOTE
For helicopters on the Part B inspection program,
accomplish the following checks each 600 hours flight
time or 12 calendar months, whichever occurs first.
GENERAL
Each listed inspection item or maintenance function is to be
performed in accordance with the 212 Maintenance Manual
chapter specified.
PRELIMINARY REQUIREMENTS
1. All work accomplished during inspection shall be recorded
in helicopter maintenance records.
2. Remove all fuselage and tailboom access panels,
removable floor panels, fairings, and cowlings.
3. Perform a complete 300 hour — Part B inspection.
4. Ensure all applicable Special Inspections, Alert Service
Bulletins, and Airworthiness Directives have been accomplished.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Textron Bell 212 and is the answer not in the manual?

Textron Bell 212 Specifications

General IconGeneral
BrandTextron
ModelBell 212
CategoryToy
LanguageEnglish

Related product manuals