EasyManua.ls Logo

Textron Bell 212 - 25 Hours;30 Days Inspection

Textron Bell 212
269 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-212-MM-1
5-00-00
26 JUN 2013 Rev. 14 Page 61
Export Classification C, ECCN EAR99
5-12. 25 HOURS/30 DAYS — PART B
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:________________________________________
NOTE
For helicopters on the Part B inspection program,
accomplish the following checks each 25 hours of
flight operation or 30 days, whichever occurs first.
GENERAL
1. Each listed inspection item or maintenance function is to
be performed in accordance with the referenced Maintenance
Manual chapter specified or BHT-212-CR&O manual.
2. Refer to Pratt & Whitney Canada PT6T-3/-3B Maintenance
Manual for engine inspection requirements.
PRELIMINARY REQUIREMENTS
CSSD-PSE-87-001 1. Use medium helicopter corrosion control guide to establish
helicopter corrosion control program.
Chapter 4 2. Replace all finite life components that have completed
published operating limitations.
Chapter 5 3. Overhaul all components that have completed published
overhaul periods.
Chapter 12 4. Lubricate and service helicopter as required.

Table of Contents

Related product manuals