BHT-212-MM-1
5-00-00
Page 30 Rev. 14 26 JUN 2013 Export Classification C, ECCN EAR99
Paragraph 5-57 8. Overhaul all components which have completed published
overhaul periods.
Chapter 12 9. Perform lubrication requirements.
NOTE
The following step is to be performed every
12 calendar months.
10. Inspect all fuel system, oil system, and hydraulic system
filler caps for proper functioning and sealing. Make sure the
sealing O-rings within the filler caps are in good condition.
Repair or replace the filler caps or replace sealing O-rings as
required.
Chapter 21 HEAT/VENT AIR DUCTS
1. Visually inspect all heating, ventilation, cooling ducts, and
controls for cracks, security and proper operation.
Every sixth 100 hour inspection (600 hours) or 12 months:
2. Bleed air heating and ventilation/defog system
components:
a. Perform functional check of bleed air heating system
and components.
b. Perform functional check of defog blower.
Chapter 25 MISCELLANEOUS FURNISHINGS
1. Check all safety equipment for inspection due dates and
operation.
Chapter 26 FIRE PROTECTION
1. Make sure fire extinguishers are properly charged.
2. Baggage compartment smoke detector for condition and
security.
5-9. 100 HOURS/12 CALENDAR MONTHS — PART A (CONT)
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER