EasyManua.ls Logo

Textron Bell 212 - 5-15. 3000 HOURS; 5 YEARS - PART B

Textron Bell 212
269 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BHT-212-MM-1
5-00-00
26 JUN 2013 Rev. 14 Page 99
Export Classification C, ECCN EAR99
5-15. 3000 HOURS/ 5 YEARS — PART B
DATA REFERENCE INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: __________________________________________
HELICOPTER S/N: ___________________________________
REGISTRY NO.: _____________________________________
TOTAL TIME:_______________________________________
SIGNATURE:________________________________________
NOTE
For helicopters on the Part B inspection program
accomplish the following checks each 3000 hours
flight time or 60 calendar months, whichever occurs
first.
GENERAL
Each listed inspection item or maintenance function is to be
performed in accordance with the maintenance manual chapter
specified.
PRELIMINARY REQUIREMENTS
1. All work accomplished during inspection shall be recorded
in helicopter maintenance records.
2. Remove all panels, fairings, and cowlings required to
satisfactorily carry out the inspection.
3. In addition to the 3000 hour/5 year — Part B inspection
items, carry out the following:
a. Complete 25 hour/30 day — Part B inspection.
b. Complete 300 hour — Part B inspection.
c. Complete 600 hour/12 month — Part B inspection.

Table of Contents

Related product manuals