ENGINE
5-30 Z580/Z593/Z595 Diesel Service Manual
5
24. Position the ground wire and negative battery cable
terminal to the engine block and install the engine
block grounding bolt and washer (Fig. 518).
26. Install the following to the starter solenoid (Fig. 520):
A. Bolt, nut and washer securing the negative battery
cable and fuel lines
B. Bolt and 2 washers securing fuel lines
Fig 518 PICT-3593
Fig 520 PICT-3589
A. Harness spade terminal
B. Battery cable
C. Starter and harness terminal
25. Position the 2 harness R-clamps to the front of the
engine and install the bolts and washers to secure
(Fig. 519).
Fig 519 PICT-3590
23. Apply thread locking compound to the engine block
grounding bolt (Fig. 517).
Fig 517 PICT-3669a
A
C
B
A
B