11
InstallingtheAttachment
Partsneededforthisprocedure:
1
Attachment(orderedseparately;refertoyour
authorizedT orodistributor)
2
Bolt(5/16x2inches)
2
Nut(5/16inch)
Procedure
Installthefrontattachment(e.g.,cuttingunit,plow
blade,orblower);performthefollowingstepsand
refertoyourattachmentOperator’sManualfor
additionalinstallationinstructions.
1.Haveanassistantsitintheseat,turnthekey
totheONposition,andusetheattachmentlift
switchtolowertheliftarmswhileyoupushdown
ontheliftarms.
2.Alignthelift-armholeswiththeattachment-arm
holespertheattachmentInstallationInstructions.
3.WhenyouinstallthePTOshafttothegearbox,
assembleeachpairofbolts(5/16x2inches)
andnuts(5/16inch)oppositeeachother(Figure
15)andtorquethenutsto40N∙m(30ft-lb).
g299646
Figure15
1.Gearbox
3.Boltsandnuts
2.PTOshaft
12
CheckingtheFluidLevels
NoPartsRequired
Procedure
Beforeyoustarttheengineforthersttime,perform
thefollowinguid-levelchecks:
•Checktheengine-oillevel;refertoCheckingthe
Engine-OilLevel(page44).
•Checkthecoolantlevel;refertoCheckingthe
CoolingSystemandCoolantLevel(page52).
•Checkthehydraulic-uidlevel;refertoChecking
theHydraulic-FluidLevel(page58).
13
CheckingtheTirePressure
NoPartsRequired
Procedure
Checkthetirepressure;refertoCheckingtheTireAir
Pressure(page24).
Important:Maintainpressureinalltiresto
ensureagoodquality-of-cutandpropermachine
performance.Donotunderinatethetires.
14
InstallingtheCEKit
Partsneededforthisprocedure:
1
CEKit(orderedseparately;refertoyourauthorized
Torodistributor)
Procedure
Ifyouoperatethemachineinacountrythatcomplies
toCEstandards,installtheCEKit;refertothekit
InstallationInstructions.
17