EasyManua.ls Logo

Toro Z Master Z400 Series - Page 120

Toro Z Master Z400 Series
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-33Z Master Z400 Service Manual
5
ENGINE
b. Reconnect the z-bend of the choke cable to
the choke linkage (the middle hole in the choke
plate). The choke linkage should be in the full
open position (up). Tighten the cable clamp
(Fig. 331).
Fig 331 PICT-0342
Fig 332 PICT-0293
21. Reconnect the throttle cable:
a. Position the throttle control lever so that there is
approximately1/2”(12.7mm)betweenthelever
and the full throttle position of the throttle slot
(Fig. 332).
Fig 333 PICT-0343 rev
b. Reconnect the z-bend of the throttle cable to the
throttle linkage (the lowermost hole of the throttle
plate). Push down on the throttle linkage to
hold it in the wide open throttle (WOT) position.
Tighten the cable clamp (Fig. 333).
22. Install the 6 bolts, washers and nuts holding the rear
bumper to the frame (Fig. 334).
Fig 334 PICT-0321
23. Install the rear wheels. Lower the machine to the
ground.
24. Connect the battery negative cable.

Table of Contents

Related product manuals