5-39Z Master Z400 Service Manual
5
22. Remove the engine pulley, spacer and key (Fig.
354).
Fig 354 PICT-0414
ENGINE
Fig 356 PICT-0419
24. Connect chains to the two lift points on the engine
and raise the engine from the frame (Fig. 356).
Fig 355 PICT-0416
23. Remove the 4 engine mounting bolts, washers and
nuts (Fig. 355).
Z 100 Series FH580V (KAI) 19 hp
Kawasaki Install
1. Lower the engine onto the frame. Install the 4
engine mounting bolts, washers and nuts through
the frame and engine mounts. Tighten the bolts.
2. Apply anti-seize compound to the engine shaft (Fig.
357).
Fig 357 PICT-0025c