5-43Z Master Z400 Service Manual
5
ENGINE
15. Turn the fuel shut-off valve to the “on” position (Fig.
370).
Fig 370 PICT-0406
Fig 372 PICT-0293
17. Reconnect the throttle cable:
a. Position the throttle control lever so that there is
approximately1/2”(12.7mm)betweenthelever
and the full throttle position of the throttle slot
(Fig. 372).
Fig 371 PICT-0404
16. Connect the green oil sending wire to the oil
pressure switch (Fig. 371).
1/2”
b. Reconnect the z-bend of the throttle cable to
the throttle linkage (the top hole of the throttle
plate). Pull the throttle linkage all the way to the
right and hold it in the wide open throttle (WOT)
position. Install and tighten the cable clamp
(Fig. 373).
Fig 373 PICT-0420