Central remote controller Owner’s Manual
42
-EN
Operating Sch settings
1 In the “All” screen, press [ ] (Menu).
The “Settings Menu” is displayed.
2 In the “Settings Menu” screen, select “Schedule settings” and
then press [ ] (Confirm).
The “Schedule settings” screen is displayed.
3 Select “Operating Sch settings” using [∧] and [∨], and then
press [ ] (Confirm).
The “Select Zone” screen is displayed.
• The zones for which no air conditioner is registered are not
displayed.
Select Zone
4 Select the zone to set using [<], [∧], [∨], and [>], and then press
[ ] (Confirm).
The “Weekly display” screen of the selected zone is displayed.
5 Select week to change using [∧] and [∨], and then press [ ]
(Confirm).
The cursor moves to the first day of the selected week.
Weekly display
6 Select the date using [<] and [>], change (Enable), (Void),
and (Special day) using [∧] and [∨], and then press [ ]
(Confirm).
The cursor moves to the week of the “Weekly display”.
• If you press [ ] (Return) without pressing [ ] (Confirm), the setting
is cancelled and the screen returns to the state it was in before the
change was made.
• If you do not press [ ] (Confirm) after making the change, you
cannot switch to the “Weekly Schedule” screen.
• You can make the settings for up to 5 weeks ahead.
• By default, (Enable), is set for all days.
• For information about the setting of special days, see “Changing the
details of the special day schedule settings” (P.46).
7 Place the cursor on the Weekly display (left end) or the day of
the week you want to set, and the press [ ] (Control).
The “Weekly Schedule” screen is displayed.
Weekly Schedule
8 Select the day of week to set using [<] and [>] and the
schedule to set using [∧] and [∨], and then press [ ]
(Confirm).
The “Schedule editing” screen is displayed.
• No more than 8 schedules can be set a day.