EasyManua.ls Logo

Toyota 2GR-FE - Page 39

Toyota 2GR-FE
1021 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EM–38
2GR-FE ENGINE MECHANICAL – ENGINE ASSEMBLY
EM
4. INSTALL NO. 1 VACUUM SWITCHING VALVE
ASSEMBLY
(a) Install the bolt and No. 1 vacuum switching valve.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
5. INSTALL RADIO SETTING CONDENSER
(a) Install the 2 bolts and 2 radio setting condensers.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
6. INSTALL NO. 1 ENGINE MOUNTING BRACKET
FRONT LH
(a) Install the No. 1 engine mounting bracket front LH
with the 6 bolts.
Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf)
7. INSTALL WATER PUMP PULLEY (See page CO-10)
A132992
A132991
A129646

Table of Contents