94
RLC-SVX09Q-EN
6. Testing
Dry nitrogen available for pressure testing
Trace gas amounts of appropriate refrigerant
available for leak testing, if necessary
7. Unit Charging
Refrigerant on job site if nitrogen charge option
selected
8. Systems can be operated under load conditions
9. Heaters
Energize oil separator and compressor heaters and
verify they are operational using a temperature
probe.
If unit was factory charged (model number digit 45=
5 or 7), energize heaters for 24 hours prior to
start-up.
Important: It is required that chiller heaters are
energized for a minimum of 24
hours prior to start-up. Therefore,
chiller should have power for this
amount of time before Trane Service
arrives to do start-up.
If unit has nitrogen charge (model number digit 45 =
6 or 8), contact Trane Service for unit charging prior
to start-up.
10. Equipment Room
Does the equipment room have a refrigerant
monitor/sensor capable of monitoring and alarming
within the allowable exposure level of the
refrigerant?
Does the installation have properly placed and
operating audible and visual refrigerant alarms?
Does the equipment room have proper mechanical
ventilation?
If it is required by local code, is a self-contained
breathing apparatus available?
11. Owner Awareness
Does the owner have a copy of the SDS for
refrigerant and oil?
Note: Additional time required to properly complete the
start-up and commissioning, due to any
incompleteness of the installation, will be invoiced at
prevailing rates.
This is to certify that the Trane® equipment has been
properly and completely installed, and that the applicable
items listed above have been satisfactorily completed.
Important: It is required that the heaters are energized for
a minimum of 24 hours prior to start-up.
Therefore, the chiller should have power for
this amount of time before Trane Service
arrives to do start-up of the equipment.
Checklist
completed by: ________________________________
Signed: ________________________________
Date: ________________________________
In accordance with your quotation and our purchase order
number __________________, we will therefore require
the presence of Trane service on this site, for the purpose
of start-up and commissioning, by __________________
(date).
Note: Minimum two-week advance notification is required
to allow scheduling of the chiller start-up.
Additional Comments/Instructions:
Note: A copy of this completed from must be submitted to
the Trane Service Office that will be responsible for
start-up of chiller.