7.3 Running
The LEDs on the control panel light up as shown in the accompanying table.
Lighting sequence of LEDs on control panel during a 4-minute cycle
Stage of cycle Tower 1 Tower 2
D R D R
I (90 seconds) On Off Off On
II (30 seconds) On Off Off Blinks
III (90 seconds) Off On On Off
IV (30 seconds) Off Blinks On Off
Caution: Each time that a regeneration tower depressurises, a loud noise is produced. This occurs every 2 minutes.
In dryer models with pre-filters and electronic auto-drains, every 4 minutes, the valve at the bottom of the pre-filter opens
automatically and discharges condensate for 4 seconds.
The cycle times are fixed and cannot be adjusted by the user.
7.4 Shutting down
Follow this procedure when shutting the dryer down:
l Open the bypass valve.
l Close the inlet valve.
l Close the outlet valve.
l Turn off power to the dryer.
15