EasyManua.ls Logo

UFactory 850 - Page 30

UFactory 850
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
1.2.2.4. Control Box Networking
Plug the Network Cable into the interface marked LAN on the Control Box,
and plug the other end of the Network Cable into the computer.
1.2.2.5. End-effector Installation
The End-effector flange has 6 M6 threaded holes and one Ф6
positioning hole, where the end-effector of two different sizes can be

Table of Contents

Related product manuals