4
Take the glazing bars from the roof pack and check the anchor
clipsaretted(theclipsarealwaysatthetopoftheslope).Onthe
eaves beam check that there are the correct amount of twin and
singleboltsandthattheglazingsupporttrimistted.
Attachtheglazingbarendcapxingblocks-asaccessrestrictions
(box gutter situations) may prevent easy attachment later. NOTE:
These are attached to the end caps when despatched from the
factory.
Checktheconditionofthehostwallasthismayaectthequalityofthenalinstallation.Checkthehostwallisplumb-anyrunningin/
or out should have been accounted for by the surveyor. If not, the ridge and starter bars may require packing out with aluminium shims.
Correct alignment in this area is critical to a successful installation - Plumb frames/level ridge.
Onlyusethespeciedxings-neverbetemptedtosubstitutealternativesizes/gauges.
Atthisstagedonotxtheframesdown-pinonlytothehouse
wall(onexperside)toallowtheconservatoryto‘oat’.
Unpack the roof vent sash and assemble, see section 2 page 5.
If possible, do this in the factory the day before.
Use the correct sealant
MS Polymer
Low modulus
neutral cure
- Polycarbonate glazing
- Standard sealed units
- Conservaglass
- Self cleaning glass
PRE INSTALLATION CHECKS
SECTION 1