EasyManuals Logo

Vaillant ecoTEC plus 937 Instructions And Maintenance Instructions

Vaillant ecoTEC plus 937
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
17Installation and maintenance instructions ecoTEC plus 0020031552_03
4 Sequence of operations during
installation
4.1 Transporting the appliance
a
Important:
With regards to the Manual Handling Operations,
1992 Regulations, the following lift operation
exceeds the recommended weight for a one man
lift.
General recommendations when handling
Clear the route before attempting the lift.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Keep load as close to body as possible. Do not twist –
reposition feet instead.
If 2 persons performing lift, ensure co-ordinated
movements during lift.
Avoid upper body/top heavy bending - do not lean
forward/sideways.
Recommend wear suitable cut resistant gloves with
good grip to protect against sharp edges and ensure
good grip.
Always use assistance if required.
Removal of carton from delivery van
Recommend 2 person lift or 1 person with use of sack truck.
If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
Recommend secure appliance onto truck with suitable
straps.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Keep load as close to body as possible.
If 2 persons performing lift, ensure co-ordinated
movements during lift.
Always use assistance if required.
Carriage of carton from point of delivery to point of
installation – ground floor.
Recommend 2 person lift or 1 person with use of sack truck.
If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
Recommend secure appliance onto truck with suitable
straps.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Keep load as close to body as possible.
If 2 persons performing lift, ensure co-ordinated
movements during lift.
Clear the route before attempting the lift.
If removing boiler from truck straddle the load and tilt
forwards to facilitate secure grip.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Do not twist – reposition feet instead.
Take care to avoid trip hazards, slippery or wet
surfaces and climbing steps and stairs.
Always use assistance if required.
Carriage of carton from point of delivery to point of
installation – first or higher floor, cellar.
Recommend 2-person lift or 1 person with use of sack
truck.
If 1 person is performing lift, straddle the load, tilt and
place carton into position on truck.
Recommend secure appliance onto truck with suitable
straps.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Keep load as close to body as possible.
If 2 persons performing lift, ensure co-ordinated
movements during lift.
Avoid upper body/top heavy bending - do not lean
forward/sideways.
Clear the route before attempting the lift.
If removing boiler from truck straddle the load and tilt
forwards to facilitate secure grip.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Do not twist – reposition feet instead.
Take care to avoid trip hazards, slippery or wet
surfaces and climbing steps and stairs.
Always use assistance if required.
Carriage of carton from point of delivery to point
of installation – roofspace.
• Recommend 2-person lift.
Ensure co-ordinated movements during lift.
Avoid upper body/top heavy bending - do not lean
forward/sideways.
Clear the route before attempting the lift.
Take care to avoid trip hazards, slippery or wet
surfaces and climbing steps and stairs.
When transferring appliance into roofspace,
recommend 1 person to be in roofspace to receive the
appliance and other person to be below to pass up
and support appliance.
Ensure safe lifting techniques are used – keep back
straight – bend using legs.
Keep load as close to body as possible.
Always use assistance if required.
It is assumed safe access, flooring and adequate
lighting are provided in the roof space.
It is recommended a risk assessment of the roof space
area be carried out before moving the appliance into the
area to take into account access, stability of flooring, ligh-
ting and other factors, and appropriate measures taken.
Unpacking of appliance from carton.
Recommend 2 persons unpack appliance from carton.
Always keep working area clear.
Recommend straps and open carton flaps, then remove
items from the top including the polystyrene packing
and remove carton by sliding up over the boiler.
Sequence of operations during installation 4

Table of Contents

Other manuals for Vaillant ecoTEC plus 937

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vaillant ecoTEC plus 937 and is the answer not in the manual?

Vaillant ecoTEC plus 937 Specifications

General IconGeneral
ModelecoTEC plus 937
CategoryBoiler
TypeCombination
Output37 kW
Dimensions720x440x338 mm
MountingWall-mounted
ERP Efficiency RatingA
Fuel TypeNatural Gas
Flow Rate15.2 l/min
Hot Water Flow Rate15.2 l/min at 35°C temperature rise
Gas TypeNatural Gas
Warranty5 years
Efficiency94%
DHW Output4.0 - 37.0 kW

Related product manuals