ENGLISH 33 / 74 CAP. 7 - INSTALLATION
ClimFill Maxi
ClimFill
®
Maxi is supplied with the accumulation tank empty. This prevents problems in
shipping the unit.
GAS SCALE SCREW RELEASE
The equipment is transported, with the scale blocked by a locking screw to avoid load
cell damage. The scale locking screw is placed on the equipment bottom (see the box
shown above) and is made up of a bolt with wing-nut. For commissioning, slacken the
wing-nut, unscrew the screw by 4 mm from the fixing ring nut and fix the wing-nut
again.