EasyManua.ls Logo

Vector Revolution 180 - Page 56

Vector Revolution 180
151 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Run 9
________________________________________________________________________________________
_______________________________________
9-3
Push the end of the edgeband into the tape winder ring (903) and rotate the head anti-
clockwise to bring this band end around behind the winder.
Lead the band from the tape coil directly through the loop (904), through the guide (905),
behind the corner sensor guide (6) and into the infeed guide (7) – see next 2 photos.
903
903
903
904
905

Table of Contents