EasyManua.ls Logo

Vector Revolution 180 - Page 71

Vector Revolution 180
151 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Run 9
________________________________________________________________________________________
_______________________________________
9-18
9.1.7.1 Running a glue-tape test
Load the tape (see 9.1.1) and turn on the glue (9.1.2).
Enter the Functions pageusing the icon (989)
Ensure the Glue (926) is turned
on and at temperature (ie now low
glue temp alarm)
Turn on the Tape Feed (994)
The tape will be fed across the glue nozzle, triggering the tape present switch (911) and
starting the glue. It will start at lower feed speed and then after about 300mm of travel
jump to fast speed.
988
989
994
926

Table of Contents