EasyManua.ls Logo

VERDEGRO Blade - Arrow Board Frame Attachment

VERDEGRO Blade
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 53 of 68
Operation and maintenance manual Verdegro Blade
10.2 Arrow Board Frame to TMA:
We advise to install the Blade Arrow board Frame to the TMA at a vertically stored TMA
(before its connected to the truck). It’s also possible to do it when TMA is already
connected to the truck.
The frame must be Fitted to the TMA using a total of : 8 pcs M20 Bolts and nuts + 4 pcs
M16 bolts and nuts; more exactly 4 pcs M20 To the left connection and 2 pcs M16 to the
left, same on right side.
Figure 46
Figure 45 Bolted connections

Table of Contents