10.5 Maintenance schedule
Minibar Espresso
Yearly Replace
inspect clean each
AIR BREAK
TANK
Empty and clean the air break tank.
Check the hoses for damage or contamination.
Check the working of the level sensors.
yearly
yearly
yearly
yearly
-
-
-
if needed, max. two years
-
FLOW METER Check the hoses for damage or contamination.
Check if the hoses are installed properly
yearly
yearly
-
-
if needed, max. two years
-
BOILER- Empty the boiler and check for limescale.
Descale the boiler when neccessary, especially when
no filter is used.
Check the valve block and three way valve for signs of
leakage.
Check the seals of valve block, NTC sensor and
replace if needed.
6 months
6 months
6 months
yearly
yearly
6 months
yearly
yearly
-
-
-
if needed, max. two years
PUMP Check the pump for signs of leakage.
Check if the hoses are undamaged, clean and installed
properly
- installed properly (not loose)
- with clamps or tieraps for securing
- undamaged (not running against sharp edges) and
clean
Check if the rubber mounting is not damaged and still
soft.
Check if the bypass is functioning
6 months
6 months
yearly
yearly
-
-
-
-
-
if needed, max. two years
-
-
GRINDER Check the grinder and surrounding on residu and lost
beans.
Check the grind setting (coarseness and weight).
Check the grind disc for (abnormal) wear.
Check the motor for wear.
6 months
6 months
12 months
yearly (20.000 cycles)
6 months
-
-
-
-
-
1000-1500 kg
(approx. 80.000-120.000
cycles – dep. on several
factors)
max. 200.000 cycles
BREWER Check if the brewer is maintained well. Clean
thoroughly.
Run an extra cleaning procedure and check:
- the seals for wear.
- the filter for wear.
- the brew chamber for wear.
Check if the couplings are fastened well.
Check if the hoses don’t have excessive dirt,
discoloration or contamination.
every visit
6 months
6 months
6 months
3 months
6 months
-
if needed
-
-
yearly
yearly
if needed
2 years
yearly
MIXER Check if the mixer parts are cleaned properly by the
operator. If contaminated too much, replace those
parts.
Check the locking ring:
- the outer O-ring
- the shaft seal (no signs of leakage behind on the
shaft)
Remove the motor:
- check/clean the base ring from residu
- clean the motor housing from dust/residu
Check if the hoses don’t have excessive dirt,
discoloration or contamination.
each visit
each visit
yearly
6 months
3 months
3 months
yearly
-
if needed, max. two years
yearly
if needed
yearly