8
7. Thedistancebetweenthedrainandthewatersoftenershouldbeasshortaspossible.
8. Sincesaltmustbeperiodicallyaddedtothebrinetank,itshouldbelocatedwhereitiseasilyaccessible.
9. Donotinstallanysoftenerwithlessthan10ftofpipingbetweentheoutletandtheinletofawaterheater.
10. Do not locate unit where it or its connections (including the drain and overflow lines) will ever be
subjectedtoroomtemperatureunder34˚F/1.1˚C.
11. IfyouaresolderingcopperfittingsthatconnecttothebypassassemblymakesurethatthefittingisNOT
connectedtothebypassassemblywhichisplastic.Theheatcouldmelttheplasticthreads.
12. Drain Line Connection: Connect ½” I.D. drain line with a
clamp to drain line barb fitting connector on the valve. The
plasticbarbfittingsfordrainlineandbrinelinearedesignedto
be screwed and unscrewed by hand to the valve. If leakage
occurs carefully use pliers to tighten until leakage stops. When
the drain line is elevated but empties into a drain below the
levelofcontrolvalve,forma7”loopatthedischargeendofthe
linesothatthebottom oftheloopislevelwithdrainconnection
on the control valve. This will provide an adequate anti-
siphon trap. The drain line can be piped overhead to a
maximum of 3 ft provided that adequate pressure is available
(40-60psi is recommended). Where the drain empties into an
overhead sewer line, a sink-type trap must be used. Run drain
tube to its discharge point in accordance with plumbing codes.
Rundrainhosetofloordrain,laundrytuborstandpipetakingmeasurestosecurethehosetoprevent
“whipping“actionduringregenerationmodesincedrainlinehoseisunderpressureduringbackwashing
andrinsecycles.Alwaysallowaminimumairgapof11/2”betweentheendofdrainhoseanddrain
topreventsewerbackup.
13. Overflow Line Connection:
An overflow drain line is recommendedwherethe brine overflow could
damagefurnishingsorthebuildingstructure.Yoursoftenerisequippedwith
brinetanksafetyvalvewhichgreatlyreducesthechanceofanaccidental
brineoverflow. Intheevent ofa malfunction,however,an overflowline
connectionwilldirectthe“overflow”tothedraininsteadofspillingonthe
floorwhereitcouldcausedamage.Thefittingisanelbowonthebackside
ofthebrinetank.Attachalengthof2.1m½”I.D.tubingtothebarbelbow
fittingandrun todrain.Donotelevatetheoverflowline higherthan3”
belowbottomofoverflowingfitting.Donot“tie”thistubeintothedrainline
ofthecontrolvalve.Overflowlinemustbeadirect,separatelinefrom
overflowfittingtodrain,sewer,ortub.Allowanairgapasperdrainline
instructions.
CAUTION: NEVER insert a drain line into a drain, sewer line or trap. Always
allow an air gap between the drain line and the wastewater to prevent
thpossibility of sewage being back- Siphoned into the water softener.