| Installation
24
|
Puranity TU+ VWR
Chapter 7
1. 1/4“ thread connector for final filter
2. Tank back flow connector for outer diameter1/4“ tube
3. Tank flow connector for outer diameter 1/4“ tube
4. Concentrate connector for outer diameter 1/4“ tube
5. Feedwater connector for outer diameter 1/4“ tube
6. Dispenser back flow connector outer diameter 1/4“ tube for additional hand dispenser
7. Dispenser flow connector outer diameter 1/4“ tube for additional hand dispenser
8. Optional printer connector
9. Power supply connector 24V DC
10. Level control connector for external pure water tank
11. Quick connectors for RO/pretreatment cartridge
12. Quick connectors for ultrapure cartridge
NOTE!
When you remove the tube jumper between Pos. 6 and Pos. 7, you have the possibility to
connect additionally the accessory hand dispenser, ((171-1181) purchased separately). This
hand dispenser comes with an installation guide.