EasyManua.ls Logo

VWR Puranity TU3+ - Chapter 10 Initial Start up; Putting the System into Operation

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VWR Puranity TU+ | 39
Initial start up
Putting the system into operation
NOTE!
The system must warmed up or cooled down to room temperature before being put into
operation.
CAUTION
Check that all connections have been made as described in Chapter 7 “Installation” on
page 21 or shown in the bottom diagram.
1. Concentrate connector for outer diameter 1/4“ tube
2. Feedwater connector for outer diameter 1/4“ tube
3. Tank overflow connector for outer diameter 1/4“ tube
4. Tank back flow connector for outer diameter 1/4“ tube
5. Tank flow connector for outer diameter 1/4“ tube
6. Concentrate connector for outer diameter 1/4“ tube
7. Feedwater connector for outer diameter 1/4“ tube
1
2
3
Connections Puranity TU 3+/6+
Connections Puranity TU 12+
4
5
6
7

Table of Contents