EasyManua.ls Logo

Wacker Neuson WM 130

Wacker Neuson WM 130
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reassembly Procedures WM 130/170/270 Repair
wc_tx000379gb.fm 78
9.32 Break-in Operation
A new engine or one that has been completely overhauled by being
fitted with a new piston, rings, valves, and connecting rod should be
thoroughly run-in before being put into service.
Good bearing surfaces and running clearances between the various
parts can only be established by operating the engine under reduced
speed and loads for a short period of time.
Run-in the engine according to the schedule below. During the run-in
period, check for oil leaks, make final carburetor adjustments, and
regulate the engine operating speed.
Step
Engine Load
Speed (rpm)
Duration
(min.)
WM 130 WM 170 WM 270
1 No load 2500 10
2 No load 3000 10
3 No load 3600 10
4 1.5 hp 2 hp 3.5 hp 3600 30
5 3 hp 4 hp 7 hp 3600 30

Table of Contents

Other manuals for Wacker Neuson WM 130

Related product manuals