5.0 INSTALLATION AND FIXING
2
FIL.SILOTOP_zero.--.M.A4.0722.EN Issue: A4
07.22
28
5.7 Inspection
Important
When installation is complete, authorized personnel must carry out a general test to ensure that the
safety conditions have been completely satised.
The authorized personnel must also check:
- that no tools or other material have been forgotten inside the lter;
- that the xing screws have been tightened using the prescribed torque;
Before starting up the lter:
- Ensure that the plant in which the lter is installed is compliant to the Directive 2006/42/ EC and to the rel-
evant directives, the safety standards in force and those specically applicable;
- Make sure inspection hatches are locked with the supplied bolts inserted in their original position.
- Ensure that the operating conditions were met.
5.8 Start-up
Preliminary checking
After having nished the electrical and pneumatic connections, carry out the following preliminary checks:
- make sure the electronic board is powered and set correctly;
- make sure the air tank pressure is 6 bar;
- make sure all the screws and clamps have been tightened;
- make sure all the elements have been xed correctly to the seal frame;
- make sure the gaskets are all intact and close the inspection hatch;
- ensure the warning plates are present.
- make sure all pipes connected to the lter, if present, are screwed and properly tted;