EasyManuals Logo

WEICHAI WP12 User Manual

WEICHAI WP12
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #22 background imageLoading...
Page #22 background image
17
Properly check the fuel system for loose connections and leaking
joints. Loose connection or damaged sealing will cause air to enter
into the system
4.3.5.(a) Priming the fuel system
Operate the hand priming pump (lift pump) provided on the FIP several times till
the low pressure system get pressurized (gure 4.14). Remove trapped air from the
system stage by stage. Refer section 5.7.7 for details about air bleeding from the fuel
system. The fuel lters, FIP and the high pressure line is lled with fuel when assembled
and tested in the factory. In normal case, no air bleeding is required after the FIP.
W
D
6
1
5
6
8
C
1
5
1
4
C
0
0
2
0
5
0
Figure 4.14
4.3.6 Electrical system
Understand engine start, stop, safety control (alarm and display) and parameter
display location available on the engine control panel.
4.3.7 Engine starting, operating and stopping
Engine can be operated (start and stop) from the main and
remote panels. Select the operation mode (main/ remote) before
operation

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WEICHAI WP12 and is the answer not in the manual?

WEICHAI WP12 Specifications

General IconGeneral
Engine ModelWP12
Number of Cylinders6
Displacement11.596 L
Bore x Stroke126 mm x 155 mm
Compression Ratio17:1
Max Torque2100N.m
Weight1100 kg
Fuel SystemHigh Pressure Common Rail
Fuel Consumption≤195g/kWh

Related product manuals